Project Management Services

NASKAGON Group offers comprehensive Project Management services, ensuring that all projects—whether in construction, solar energy, roads, ICT, or water management—are delivered on time, within budget, and to the highest quality standards. Our structured approach minimizes risks, optimizes resources, and guarantees client satisfaction.

Key Project Management Capabilities:

A construction site with a large building featuring multiple arches and columns in the background. The foreground is dominated by piles of dirt and construction equipment, including an excavator. There are metal beams and supporting structures scattered around, and a person wearing a safety helmet is standing nearby.
A construction site with a large building featuring multiple arches and columns in the background. The foreground is dominated by piles of dirt and construction equipment, including an excavator. There are metal beams and supporting structures scattered around, and a person wearing a safety helmet is standing nearby.
Sustainable Infrastructure
1. Feasibility Studies & Planning

• Site assessments and technical feasibility reports.

• Cost estimation, budgeting, and financial modeling.

• Risk analysis and mitigation strategies.

2. Design & Engineering Coordination

• Collaboration with architects, engineers, and consultants.

• Value engineering to optimize project efficiency.

• Compliance with Botswana’s building codes and international standards.

3. Procurement & Contract Management

• Vendor and contractor selection through transparent tendering.

• Negotiation and administration of contracts (FIDIC, NEC, etc.).

• Supply chain and logistics management.

4. Construction Supervision & Quality Control

• On-site project monitoring and progress tracking.

• Quality assurance (QA) and quality control (QC) protocols.

Health, Safety, and Environmental (HSE) compliance.

An under-construction bridge with scaffolding and concrete pillars, situated in an open area with clear skies. A crane and various construction materials are visible, with a vehicle parked nearby.
An under-construction bridge with scaffolding and concrete pillars, situated in an open area with clear skies. A crane and various construction materials are visible, with a vehicle parked nearby.
A black-and-white image of an industrial construction site featuring large horizontal pipes and intricate scaffolding structures. The perspective is from above, highlighting the complexity and scale of the construction work in progress. The lighting creates strong contrasts, adding depth and an architectural focus.
A black-and-white image of an industrial construction site featuring large horizontal pipes and intricate scaffolding structures. The perspective is from above, highlighting the complexity and scale of the construction work in progress. The lighting creates strong contrasts, adding depth and an architectural focus.
A construction site under a bridge featuring a partially completed structure with scaffolding. There are several construction materials, such as rocks, bags, and tanks, scattered across the ground. An upper section of the bridge includes a canopy with metal railings. Background includes trees and protective orange barriers.
A construction site under a bridge featuring a partially completed structure with scaffolding. There are several construction materials, such as rocks, bags, and tanks, scattered across the ground. An upper section of the bridge includes a canopy with metal railings. Background includes trees and protective orange barriers.
Engineering Excellence

Building a better future through innovative engineering practices.

5. Stakeholder & Communication Management

• Regular progress reporting to clients and government authorities.

• Conflict resolution and stakeholder engagement.

• Community liaison for socially impactful projects.

6. Project Scheduling & Time Management

• Critical Path Method (CPM) and Gantt chart scheduling.

• Use of advanced software (Primavera P6, MS Project, AutoCAD).

• Real-time tracking to prevent delays.

7. Cost Control & Financial Management

• Budget tracking and cost forecasting.

• Change order management and cost optimization.

• Final account closure and financial audits.

8. Commissioning & Handover

• System testing and performance validation.

• Training for end-users and maintenance teams.

• As-built documentation and operational manuals.

A construction site featuring a large tunnel entrance set against a forested hillside. There is a river flowing in the foreground with rocky banks. Various construction materials, scaffolding, and equipment, including vehicles and workers in safety gear, are scattered around the site. The sky is clear and blue, and the surrounding area is densely covered with trees.
A construction site featuring a large tunnel entrance set against a forested hillside. There is a river flowing in the foreground with rocky banks. Various construction materials, scaffolding, and equipment, including vehicles and workers in safety gear, are scattered around the site. The sky is clear and blue, and the surrounding area is densely covered with trees.

Projects Overview

1. Managed the construction of Bio-chemistry laboratories, Chemical storage, Auditoriums at Botswana University of Agriculture and Natural Resources (BUAN)

Contact: Odirile Oleseng(+267) 311 4240

Project Value: BWP 79, 000, 000.

Date Completed: On-going

2. Supply and Installation of Ultrasonic Smart Meters for Water Utilities Corporation (WUC)

Contact: Tim Ntabeni (+267) 300 4400

Project Value: BWP 164, 000, 000.

Date Completed: On Going

3. Construction of Infrastructure Services in Metsimotlhabe Block 4 for the Ministry of Land Management, Water and Sanitation Services.

Contact: Mr W Nkungwa(+267) 310 2334

Project Value: BWP 68, 000, 000

Date Completed: May 2024

4. Supply, Installation & Maintenance of CCTV Cameras and Access Control for Botswana Savings Bank(BSB).

Contact: Mr Tebogo Mosarwa (+267) 74 742 827

Project Value: BWP 6, 000, 000

Date Completed: On-going

A construction site with large concrete pillars supporting an elevated structure. In the background, there is a blue and orange industrial crane with a number 3 visible on it. The setting appears urban, with buildings surrounding the construction area.
A construction site with large concrete pillars supporting an elevated structure. In the background, there is a blue and orange industrial crane with a number 3 visible on it. The setting appears urban, with buildings surrounding the construction area.
A black and white photograph depicting the construction of a large bridge with significant steel framework. Workers can be seen standing on the bridge structure. The image shows complex architectural scaffolding and hefty metal components, with various construction tools and small buildings nearby.
A black and white photograph depicting the construction of a large bridge with significant steel framework. Workers can be seen standing on the bridge structure. The image shows complex architectural scaffolding and hefty metal components, with various construction tools and small buildings nearby.
The image features a construction site by a river with metal barriers and various equipment, including pumps and pipes. In the background, there are buildings and leafless trees under a clear sky. Graffiti is visible on some barriers, and there is signage related to the construction work.
The image features a construction site by a river with metal barriers and various equipment, including pumps and pipes. In the background, there are buildings and leafless trees under a clear sky. Graffiti is visible on some barriers, and there is signage related to the construction work.
A bustling urban construction site bordered by tall buildings, with a prominent red and white crane extending over the site. Below, construction materials and equipment are organized along the ground. Streets on either side see light traffic with pedestrians and vehicles.
A bustling urban construction site bordered by tall buildings, with a prominent red and white crane extending over the site. Below, construction materials and equipment are organized along the ground. Streets on either side see light traffic with pedestrians and vehicles.
A construction site with heavy machinery, including a yellow steamroller and a bulldozer, surrounded by large concrete pipes. There is fencing around the area with various construction materials scattered. Buildings and cranes are visible in the background, suggesting ongoing construction activities.
A construction site with heavy machinery, including a yellow steamroller and a bulldozer, surrounded by large concrete pipes. There is fencing around the area with various construction materials scattered. Buildings and cranes are visible in the background, suggesting ongoing construction activities.

5. Renovation of Bank Assurance Head Office at Botswana Savings Bank(BSB)

Contact: Mr James Koobake (+267) 73 469 098

Project Value: BWP 1, 290, 060.

Date Completed: October 2023

6. Supply of Maintenance Equipment for Water and Sanitation Company(WASCO)

Contact: Mr Lefa Molatseli(+266) 266 5810 0777

Project Value: ZAR 12, 404, 621.

Project Completed: On-going

7. Building and Commissioning a 5MW Solar PV Plant in Zambia for Zambian Electricity Supply Corporation(ZESCO).

Contact: Daniel Nguni (+260) 9777 71695

Project Value: USD 6, 325, 076.53

Date Completed: On-going